Skip to main content

Goodland Surveys At Gabon





We are working at various places in Gabon, Africa for Highway and Pipeline projects.  6 Nos of fully equipped survey teams (with DGPS, Digital Level, Total Station and a CAD Team) are engaged.  We have orders for next 3 month periods in this country.  We expect orders in Power transmission and construction industries.  Approx project turn over will be 6 million INR by end of 3 month period.


Popular posts from this blog

Methodology for the Topographical Survey work for Land Survey

Methodology for the Topographical Survey work for Land Survey Identifying the Boundary corners of the Proposed Project If the proposed project area are covered few villages and having Hundreds of individual survey nos., with the help of combined village map provided by the revenue departments and with the help of revenue surveyors, we can identify the all Corners of the boundary. Fixing of Horizontal Control Points The Horizontal Control points will be fixed by the DGPS on the permanent locations on all major corners of the area and also on the center of the proposed project area.  The secondary control points shall be fixed on available permanent location by Total Station. Traverse Total Station having 5” or more accuracy shall be used for this activity. The Traverse loops to be connected to DGPS pairs and closing error to be calculated. The error shall be adjusted on all points fixed by Total Stations thru  Bowditch Rule . The accuracy will be 1:20,000. Fixing of...

UTM

Our ongoing survey projects are......

New Projects 1) Jammu Bypass (NHAI DPR) 2) Itawa to Kanpur 4/6 lane to 8 Lane (NHAI-BOT) Ongoing Projects 1) Major District Road Project in Madhya Pradesh - 110 kms (PWD) 2) TPP Road and Port Connectivity Road at Chennai - 15 Kms (TNRDC) 3) Sangareddy to Andhra Pradesh/Karnataka Border Section of NH-9 - 70 kms (NHAI-BOT) 4) Bypasses in Yedeshi-Aurangabad Section for 65 kms (NHAI-DPR) Recently Completed 1) NH-8D, Somnath to Jetpur, in the state of Gujarat (NHAI-BOT) 2) NH-7, Jabalpur to Lakhnadon, MP for 80 Kms (NHAI-BOT) 3) NH-6, Orissa Border to Aurang, Chattisgarh, 80 kms (NHAI-BOT)