Skip to main content

Posts

UTM

Our ongoing survey projects are......

New Projects 1) Jammu Bypass (NHAI DPR) 2) Itawa to Kanpur 4/6 lane to 8 Lane (NHAI-BOT) Ongoing Projects 1) Major District Road Project in Madhya Pradesh - 110 kms (PWD) 2) TPP Road and Port Connectivity Road at Chennai - 15 Kms (TNRDC) 3) Sangareddy to Andhra Pradesh/Karnataka Border Section of NH-9 - 70 kms (NHAI-BOT) 4) Bypasses in Yedeshi-Aurangabad Section for 65 kms (NHAI-DPR) Recently Completed 1) NH-8D, Somnath to Jetpur, in the state of Gujarat (NHAI-BOT) 2) NH-7, Jabalpur to Lakhnadon, MP for 80 Kms (NHAI-BOT) 3) NH-6, Orissa Border to Aurang, Chattisgarh, 80 kms (NHAI-BOT)

More Accurate and Secure Fly Level

We have added 4 Nos of Digital Level, Leica Sprinter 250M to reduce manual errors and increase the accuracy of Fly Level Click to know more about Leica Sprinter Digital Level

Survey Data Presentation

While we provide a survey drawing in plane co-ordinate system, we hear from the Highway Engineer for a KML File to take reference from Google Earth.  So, Now by default, we are proividing a kml file of the surveyed area.  The entire survey data, almost all objects in the drawing will be converted to the KML file, that can be overlapped on Google earth. See samples >  

Goodland Surveys At Gabon

We are working at various places in Gabon, Africa for Highway and Pipeline projects.  6 Nos of fully equipped survey teams (with DGPS, Digital Level, Total Station and a CAD Team) are engaged.  We have orders for next 3 month periods in this country.  We expect orders in Power transmission and construction industries.  Approx project turn over will be 6 million INR by end of 3 month period.